Building Your Space, On Time & On Budget
A transparent, safety-first process that turns design intent into operational reality.

Coordinated BIM-Based Execution
Survey control tied to BIM coordinates keeps framing, MEP runs, and finish tolerances spot-on, preventing rework and schedule drift.

Safety-First, Quality-Assured
Strict HSE protocols plus cloud punch-list QA ensure zero-incident sites and defect-free handovers that landlords sign off on the first inspection.

Transparent Handover & Support
As-built BIM files, warranties, and a 30-day soft-opening tune-up give facility teams a single source of truth for smooth operations.

1 Pre-Construction & Mobilization
Scope review, landlord approvals, and detailed site logistics planning ensure every trade starts on solid ground. A master programme aligns budget, timeline, and risk controls.

2 Selective Demolition & Site Prep
Share some details here. This is a flexible section where you can share anything you want. It could be details or some information about your highlighted work 2.

3 Setting-Out & Survey Control
Using BIM coordinates, our surveyor establishes precise datums so walls, millwork, and MEP runs install right the first time.

4 Structural & Partition Framing
Light-gauge steel studs, deflection headers, and seismic bracing create a robust skeleton that meets commercial fire ratings.

5 Mechanical, Electrical & Plumbing Rough-In
Services run in tandem, model-checked for clashes. Weekly coordination with landlords and inspectors prevents costly rework down the line.

6 Insulation, Drywall & Acoustic Treatment
High-STC wall assemblies and ceiling baffles ensure the future space meets noise criteria for open-plan offices or F&B venues.

7 Finishes & Feature Elements
Surface trades move zone-by-zone to maintain cleanliness. Bespoke joinery arrives pre-finished, reducing on-site VOC emissions.

8 FF&E, Signage & Branding Touchpoints
Furniture, fixtures, and digital displays are installed per the approved layout. Final branding accents align with the design story.

9 Commissioning & Quality Assurance
MEP systems are balanced, life-safety devices tested, and snag lists issued via cloud punch-list software—closing issues before handover.

10 Handover & Soft Opening Support
You receive as-built BIM files, warranties, maintenance manuals, and a 30-day soft-opening support plan to fine-tune operations.